Installation of aggregates in Malaga

Projects carried out/ Mining sector/ Arid crushing and screening installation in the province of Malaga Mining Sector Juny 2020 Malaga (Spain) Aggregate crushing and screening facility, secondary and tertiary stage, for a production of 250 m3/h, located in the province of Malaga. Design, manufacture, assembly and commissioning. COMPONENTS High capacity hoppers and silos Belt conveyors […]

Optimizing Construction and Demolition Waste Management with the TR100E_COMPACT Elevating Sorting System

At JLM Ingeniería, we are proud to introduce our latest innovation in construction and demolitionwaste (CDW) management: the TR100E COMPACT Elevating Sorting System. Designed to deliversuperior functionality and maximum efficiency, this compact equipment is revolutionizing the wayCDW is handled on job sites across Europe. Introduction to the TR100E COMPACT The TR100E COMPACT Elevating Sorting System […]

IV Employment and Entrepreneurship Fair

IV Employment and Entrepreneurship Fair JLM Ingeniería will be present in the IV Employment and Entrepreneurship Fair organized by the Chamber of Commerce of Murcia together with the FREMM, to be held next February 27th at the facilities of FREMM.

New C&DW plant in Huelva

New construction and demolition waste valorization plant (C&DW) in the province of Huelva JLM Ingenieria installs turnkey, a new plant for the valorization of construction and demolition waste (RCD’s) model Rec90_COMPACT in the province of Huelva. The installation that will give treatment to an average volume of 50 Tn/h is composed by the classified APV_90 […]

Guards on Belt Conveyors

Projects carried out/ Mining sector/ Installation of Guards on Belt Conveyors Mining Sector November 2018 Murcia (Spain) Installation of guards on belt conveyors in a prospecting-mining in the province of Murcia, thus complying with the crystaline silica legislations approved in the European Commission, which establish a breathable limit value of 0.1 mg/m3. Covering belt conveyors […]

Aggregate plant in Almeria

Projects carried out/ Mining sector/ Installation of Aggregate Treatment Plant in the province of Almeria Mining Sector July 2018 Murcia (Spain) Installation for the treatment and classification of aggregates located in the province of Almeria. COMPONENTS Hopper of 40 m3 capacity. Conveyor Belts U model, with UPN profile. Aggregates Feeder model AVBA 50/600. SHARE Previous […]

Biomedical waste

Projects carried out/ Industrial sector/ Line of treatment of biosanitary waste and medicinal products in Granada Industrial Sector January 2018 Granada (Spain) Installation for the treatment of hospital waste composed of a hopper of 1.5 m3 capacity and conveyor belt CA model.The integration of screen and adaptation of accesses is carried out. COMPONENTS Hopper of […]

We have certified our Quality System

JLM Ingeniería has recently obtained the ISO9001:2015 certification ISO 9001 is the most widely recognised standard for quality management. It belongs to the family of ISO 9000 standards for quality management systems, and helps organisations meet their customers’ needs and expectations, among other benefits. The certificate has been granted by Bureau-Veritas Certification, the first entity deprived […]

Protocol on C&DW management

New protocol on C&DW Management (EU Construction & Demolition Waste Management Protocol) Due to the continuously increasing Construction and Demolition Waste (C&DW), the European Commission is introducing a protocol for proper waste management, which applies to 28 countries.The process is included under the Construction Strategy 2020 and is part of the Circle Economy Package presented […]