JLM Ingeniería installs a conveying and waste sieving line in Granada.
For conveyance, a conveyor belt mod. CA 8.81 1.0 with a capacity of 3.5 m3/h capacity is supplied.
![linea-transporte-y-cribado-de-residuos-jlm-ingenieria01](https://jlmingenieria.com/wp-content/uploads/2018/02/linea-transporte-y-cribado-de-residuos-jlm-ingenieria01-900x450.jpg)
JLM Ingeniería installs a conveying and waste sieving line in Granada.
For conveyance, a conveyor belt mod. CA 8.81 1.0 with a capacity of 3.5 m3/h capacity is supplied.