Proyecto de Fabricación de Maquinaria Industrial para la Construcción. JLM Ingeniería 2016

Installation for treatment of calcium and magnesium carbonate

Installation for treatment of calcium and magnesium carbonate Installation for treatment of calcium and magnesium carbonate Manufacture and supply of complete installation, turnkey, for the treatment of calcium and magnesium carbonate composed of tromel, conveyor belts, bucket elevator, endless conveyor, storage silos, support structures and access walkways to all elements. PROJECT SECTOR: CONSTRUCTION DATE OF…

KCI Dosing and Treatment

JLM Ingeniería carries out the design, manufacturing and installation of a new potassium chloride (KCI) conveying, treatment and dosing line with a granulometry between 0 and 2 mm and 10 m3/h maximum flow rate. The installation has transporters mod. SCA300 and a truncated pyramidal hopper as the feeding component, with a rectangular base and a…